Carolina Horsepower  

Go Back   Carolina Horsepower > Everything Else > Introductions
Register FAQ Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-04-2013, 09:00 AM   #12
Rogue Status
Senior Member
 
Join Date: Apr 2013
Location: Charleston, SC
Posts: 80
Default

Quote:
Originally Posted by oldskoolstang View Post
I like 'em both. The Rx-7 should be a beast if you get it finished. You can mig aluminum, but it doesn't look that great.....but does work. I'm guessing the work you need is for the cold side?
No spool gun available for my Eastwood welder, and I would much rather have the aluminum stuff TIG'd. But yes, the cold side is where I need the welding done. Cast 90* elbow on the turbo, BOV flange welded on, bungs for both IAT and water/meth nozzle(s). Would be nice to find a person or shop that can bead roll the ends as well. The piping will be super short and with minimal bends, just need to get the intercooler in the car and mock it up then get it tacked for a test fit, then final welded.
Rogue Status is offline   Reply With Quote
 

Tags
No Merkur no care


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 04:24 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.